subject
Mathematics, 22.05.2020 20:04 tommybear989

On a coordinate plane, triangle A B C is shifted 4 units up and 3 units to the left to form triangle A prime B prime C prime. On a coordinate plane, triangle A B C is shifted 4 units up and 3 units to the left to form triangle A prime B prime C prime.
Triangle ABC is reflected over the line y = 1. What are the coordinates of B’?

(–2, 3)
(–2, 5)
(2, –3)
(4, –3)

Answers

ansver
Answer from: Quest
Ihonestly don’t no that
ansver
Answer from: Quest

they disappear if your absent from to long. i found out that the hard way.

step-by-step explanation:

brainliest lol i just need one more brainliest.

ansver
Answer from: Quest

i think u have 12 apples sorry again i don't really know if it correct i'm just tryna hrlp people out.

ansver
Answer from: Quest

i think the answer is 90 hope this

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:10, jessicapbailey52
Which linear equations have an infinite number of solutions? check all that apply.  (x  –  3/7)  =  2/7(3/2x  –  9/14)8(x  +  2)  =  5x  –  1412.3x  –  18  =  3(–6  +  4.1x)(6x  +  10)  =  7(x  –  2)4.2x  –  3.5  =  2.1 (5x  +  8)
Answers: 3
image
Mathematics, 21.06.2019 19:20, girlydiy17
Thompson and thompson is a steel bolts manufacturing company. their current steel bolts have a mean diameter of 127 millimeters, and a variance of 36. if a random sample of 35 steel bolts is selected, what is the probability that the sample mean would differ from the population mean by greater than 0.5 millimeters? round your answer to four decimal places.
Answers: 3
image
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
image
Mathematics, 21.06.2019 23:30, jailinealvarado24
Simplify. 3(4+4x) (type your answer in with no spaces)
Answers: 1
You know the right answer?
On a coordinate plane, triangle A B C is shifted 4 units up and 3 units to the left to form triangle...